The image was taken during the software training session.
Main content of the training course: Primavera P6 EPPM – Basic Course
- Introduction; Navigation includes all main and sub-tabs with full illustrations of features and functions with examples; Project Structure (EPS & OBS); Creating a Project; Creating a Work Breakdown Structure (WBS); Creating Activity Code; Adding Activities with Duration, Start and End Dates, Milestones, Creating Global & Project Calendars, Time Formatting.
- Maintain the Project Document Library; Create relationships; Relationship types, planning; Add constraints; Format data; Identify and create resources; Assign resources and calculate costs; Analyze resources and costs, create costs, identify and assign roles, resource hierarchy, assign resource schedules, import and export data, network logic diagrams.
- Optimize project plans; link project plans; execute and control projects; update projects, create multiple reports, create dashboards, performance reporting, groups, sort and filter, project website.
- Workshop: Covers all planning and scheduling phases from project start to finish in accordance with the NSRP Project Environment. Create an EPS, OBS, and WBS; Create a project, add activities with planned start and end times, create relationships; Create a Baseline, Schedule, view Schedule Data; Assign, analyze resources and costs; Level resources, update progress, report project progress, create various reports. Create different Layouts, Create Dashboards, Group, Sort, and Filter.

