Nghi Son – Project Management Training: PRIMAVERA P6 EPPM Basic Course

Chương trình

Khóa đào tạo: Primavera P6 EPPM cơ bản

Introduction; Navigation includes all main and sub-tabs with full illustrations of features and functions with examples; Project Structure (EPS & OBS); Creating a Project; Creating a Work Breakdown Structure (WBS); Creating Activity Code; Adding Activities with Duration, Start and End Dates, Milestones, Creating Global & Project Calendars, Time Formatting.
Maintain the Project Document Library; Create relationships; Relationship types, planning; Add constraints; Format data; Identify and create resources; Assign resources and calculate costs; Analyze resources and costs, create costs, identify and assign roles, resource hierarchy, assign resource schedules, import and export data, network logic diagrams.
Project plan optimization; Project plan linking; Project execution and control; Project updates, multiple report generation, dashboard creation, performance reporting, grouping, sorting and filtering, project website.
Workshop: Covers all planning and scheduling phases from project start to finish in accordance with the NSRP Project Environment. Create an EPS, OBS, and WBS; Create a project, add activities with planned start and end times, create relationships; Create a Baseline, Schedule, view Schedule Data; Assign, analyze resources and costs; Level resources, update progress, report project progress, create various reports. Create different Layouts, Create Dashboards, Group, Sort, and Filter.

asset image

CONTACT US FOR IMMEDIATE CONSULTATION

[contact-form-7 id="09a9d01" title="Form ứng tuyển ngay_copy"]
message message
call
84 33 66 77 478