Oracle Primavera Lean is the first and only product to combine Lean and Critical Path Method (CPM) in a planning approach to achieve project success and business results. This cloud-based, mobile-enabled solution automates and simplifies Lean scheduling to optimize efficiency, facilitate precise coordination, and ensure the alignment necessary for success. It also leverages the power of the industry-leading Oracle Primavera P6, providing enterprise-level visibility and control over CPM. The bottom line: enhanced coordination and command for more efficient and profitable project completion.
Stakeholders in the construction and engineering ecosystem face numerous challenges: faster deadlines, high penalties for delays, shortages of skilled resources, and rising costs eroding profitability.
Many businesses turn to Lean scheduling to ensure projects stay on schedule and within budget; however, existing tools often only partially support the Lean methodology and are not integrated into the overall enterprise management system. This creates a separation between two crucial project management methodologies: Critical Path Method (CPM) and Lean scheduling.
Oracle Primavera Lean thoroughly addresses this issue with a unified cloud platform where Lean and CPM can coexist, complement each other, and maximize value.
Oracle Primavera Lean is an integrated platform for CPM and Lean scheduling, helping stakeholders address coordination, commitment, and collaboration challenges while leveraging the synergies of these two methodologies.
Oracle Primavera Lean provides a unified platform for construction, engineering, and enterprise projects, automating processes and integrating data from the office to the field, enabling comprehensive coordination and control even for the most complex projects.
This solution unifies scope, cost, and scheduling in a single platform, providing seamless visibility from the task level to the enterprise level.