Oracle Primavera Lean Software

Oracle Primavera Lean is the first and only product to combine Lean and Critical Path Method (CPM) in a planning approach to achieve project success and business results. This cloud-based, mobile-enabled solution automates and simplifies Lean scheduling to optimize efficiency, facilitate precise coordination, and ensure the alignment necessary for success. It also leverages the power of the industry-leading Oracle Primavera P6, providing enterprise-level visibility and control over CPM. The bottom line: enhanced coordination and command for more efficient and profitable project completion.

Integrating Lean and CPM

Stakeholders in the construction and engineering ecosystem face numerous challenges: faster deadlines, high penalties for delays, shortages of skilled resources, and rising costs eroding profitability.

Many businesses turn to Lean scheduling to ensure projects stay on schedule and within budget; however, existing tools often only partially support the Lean methodology and are not integrated into the overall enterprise management system. This creates a separation between two crucial project management methodologies: Critical Path Method (CPM) and Lean scheduling.

Oracle Primavera Lean thoroughly addresses this issue with a unified cloud platform where Lean and CPM can coexist, complement each other, and maximize value.

Oracle Primavera Lean is an integrated platform for CPM and Lean scheduling, helping stakeholders address coordination, commitment, and collaboration challenges while leveraging the synergies of these two methodologies.

  • Reduce the need for complex master schedules and manage details effectively for field teams.
  • Eliminate costly, repetitive tasks, increase accountability, and minimize risks.
  • Boost field performance based on tangible commitments.
  • Synchronizing information among stakeholders towards a common goal.
  • Providing flexible visibility for businesses while respecting on-site workflows.

Features of Oracle Primavera Lean

Oracle Primavera Lean provides a unified platform for construction, engineering, and enterprise projects, automating processes and integrating data from the office to the field, enabling comprehensive coordination and control even for the most complex projects.

This solution unifies scope, cost, and scheduling in a single platform, providing seamless visibility from the task level to the enterprise level.

Oracle Primavera Lean

The solution provides an integrated environment for

  • Determine WBS: Create a visual schedule through easily manageable project phases.
  • Mapping activities and relationships: Identify the critical path (CPM) and automate the workflow.
  • Create an activity plan: Last Planners® helps you break down tasks and stay committed to deadlines.
  • Fulfilling the commitment: Track planned, completed, and overdue tasks.
  • Performance monitoring: Visual analysis of PPC and the reasons for missed commitments.
  • Real-time alerts: Synchronize changes with the CPM network and improve collaboration.

Key features

  • Displays tasks ranging from side missions to enterprise-level assignments.
  • Integrate scope, cost, and schedule on a single platform.
  • Fully integrated with Oracle Primavera P6.
  • Expand from a single project to an entire portfolio.
  • Highly personalized, avoiding information overload.
  • Update your status online and offline on your iPad/iPhone.
  • Focus on short-term tasks that reflect overall performance.
  • A complete cloud solution powered by Oracle.
  • With an easy-to-use interface and simple deployment, featuring three main data tables, Oracle Primavera Lean supports both online and offline collaboration via iPad and iPhone apps, boosting productivity and allowing users to focus on key information.
[contact-form-7 id="09a9d01" title="Form ứng tuyển ngay_copy"]
message message
call
+84 934 144 498